Location
St. Andrews, Ontario
Start Date
June 2024
Completion Date
July 2024
Rosho Demolition was hired By South Stormont to demolish the Heritage Centre in St. Andrews. Starting on type 3 interior plaster removals throughout the building, then the demolition of the building and the foundation. There was backfill and topsoil imported and compacted to 98%. The site was graded for positive drainage, then hydro seed and septic tank decommissioning. All was accomplished within a few weeks.
Asbestos Abatement
Building Demolition
Preservation of heritage components
Shane Arbuthnot—Preconstruction / Project Director
Client
Township of South Stormont
Contract Value
376,900
Final Cost
383,400
Services